MichiganStateUniversity Federal Credit Union Corporate Headquarters and Bank Branch,East Lansing. Action: Drawings Underway. Budget: N/A. Start Date: 2007. Description: Consists of a four-story plus basement, 178,000 gross square-foot credit union building.

Saint Mary's Health Care, Grand Rapids. Action: Preliminary. Budget: $60 million. Start Date: N/A. Description: New campus design. Includes a park-like plaza with a sculpture or fountain; three new medical office buildings that have retail spaces; new parking lots and garage; remodeling of existing building into hospitality house for patient's families; mixed-use housing, possibly on the campus and on the outskirts.

Proposed Construction of PUD for Retail and Restaurant, Cascade. Action: Drawings Underway. Budget: N/A. Start Date: N/A. Description: Construction of approximately 25,000 square feet of retail and 5,200 square feet of restaurant use.

Wastewater Treatment Plant,Greenville. Action: Preliminary. Budget: N/A. Start Date: N/A. Description: Upgrading existing facility.

OfficeBuildingOshtemoTownship. Action: Drawings Underway. Budget: N/A. Start Date: N/A. Description: Construction of a 5,900-square-foot office building.

Texas Roadhouse Restaurant, Fruitport. Action: Drawings Underway. Budget: N/A. Start Date: N/A. Description: Construction of 7,300-square-foot restaurant.

MuskegonCountyJailMuskegon. Action: Preliminary. Budget: N/A. Start Date: N/A. Description: Proposed construction of a new 746-bed facility.

IndustrialBuildingWalker. Action: Drawings Underway. Budget: N/A. Start Date: N/A. Description: Construction of a 24,457-square-foot spec industrial building located on 2.44 acres.

AcademicBuilding at Mackinac Hall, Allendale. Action: Drawings Underway. Budget: $20 million. Start Date: Spring 2007. Description: Construction of an 83,000-square-foot academic building, which will be an expansion at the northeast portion of Mackinac Hall.

Movement Sciences and Indoor Recreational Facility, Allendale. Action: Drawings Underway. Budget: $18 million. Start Date: Spring 2007. Description: Construction of a new 138,000-square-foot indoor athletic facility.

EastCampusUniversity Apartments, Big Rapids. Action: Design Firm Not Yet Selected. Budget: N/A. Start Date: 2007. Description: Consists of demolition of the existing East Campus Apartment buildings A, B, C, D, E, F and G and the design of new two- and four-bedroom apartments containing approximately 366 bedrooms.

Lakeside and BretonElementary Schools, East Grand Rapids. Action: Drawings Underway. Budget: $3 million. Start Date: 2007. Description: Consists of air conditioning, classroom additions, gymnasium upgrades.

FerrysburgCity Hall Ferrysburg. Action: On Hold. Budget: N/A. Start Date: On Hold. Description: Construction of a new city hall building.

Fire Station,FruitportTownship. Action: Final Update. Budget: N/A. Start Date: 2007. Description: Consists of addition to the fire station to house the police department.

Aslan Building–Israels Design for Living,Grand Rapids. Action: On Hold. Budget: $7.5 million. Start Date: On Hold. Description: Consists of renovations to an existing building for 41,060 square feet of retail space on first floor, 26 residential units on second and third floors; addition of third floor.

Extreme Car Audio,Grand Rapids. Action: Drawings Underway. Budget: N/A. Start Date: 2007. Description: 8,700 square feet of additions to existing building.

DickinsonElementary SchoolGrand Rapids. Action: Drawings Underway. Budget: $77.4 million. Start Date: N/A. Description: Construction of new building for DickinsonElementary School

Saturn of Grand RapidsGrand Rapids. Action: Drawings Underway. Budget: N/A. Start Date: N/A. Description: Renovations of existing building to include constructing 27 service stalls, demolition of 320 square feet on the west side and construction of 151 additional parking spaces.

Eureka Township Hall, Greenville. Action: Drawings Underway. Budget: N/A. Start Date: 2007. Description: Construction of a 1,600-square-foot addition to the township hall.

MontcalmCommunityCollegeMichiganTechnicalEducationCenterGreenville. Action: Drawings Underway. Budget: $846,000 Start Date: 2007. Description: Construction of a 3,000-square-foot classroom and laboratory space addition at the MichiganTechnicalEducationCenter

FooteHospitalJackson. Action: Drawings Underway. Budget: $21 million. Start Date: N/A. Description: Construction of a four-story, 60,000-square-foot surgical wing addition.

KalamazooCountyExpoCenter and Fairgrounds,Kalamazoo. Action: Design Firm Not Yet Selected. Budget: $750,000. Start Date: 2007. Description: Consists of upgrades to current buildings, construction of outdoor restrooms, construction of a new 4-H office with concession stand, upgrading electrical wiring. Also proposed is expanding the fairground campsites to 120 from 55; a new outdoor event area; addition of 36,000 square feet to the exposition and office space.

Pentwater Library, Pentwater. Action: On Hold. Budget: N/A. Start Date: On Hold. Description: Proposed expansion to existing library.

City of PortageBuilding Infrastructure Review,Portage. Action: Final Update. Budget: N/A. Start Date: N/A. Description: Perform preventative maintenance and building condition reviews for seven publicly owned buildings, including City Hall, Police/Court, DPSBuilding, SeniorCenter, Central Fire Station and Fire Stations Two and Three. The purpose of the review will be to identify and prioritize the immediate and long-term needs of the buildings so as to implement prudent preventative maintenance designed to get the maximum use and life from these publicly-owned buildings.

Village of Shelby Waste Water Treatment Plant,Shelby. Action: Drawings Underway. Budget: $3.9 million. Start Date: N/A. Description: Upgrades to improve the output of gallons per day. Includes mechanical, electrical and plumbing upgrades.

MontcalmCommunity College Bookstore,Sidney. Action: Drawings Underway. Budget: N/A. Start Date: 2007. Description: Consists of a 1,000-square-foot addition to the bookstore.

OttawaCountyFillmore Administrative Complex, West Olive. Action: Drawings Underway. Budget: $6 million. Start Date: 2007. Description: Construction of a two-level, 37,000-square-foot addition along with the reconfiguration and renovation of approximately 10,000 square feet of office space at the eight-year-old FillmoreStreetAdministrativeAnnexBuilding.